DIRTT | St. Elizabeth’s Hospital

Location: Boston, MAIndustry: Healthcare, HospitalSolutions: Interior Construction

When patient rooms aren’t in use, the lost revenue can reach up to $15,000 a day.

On this project, the cost of DIRTT’s headwall assemblies was within 1% of other considered solutions, but they shaved valuable time off the schedule. Assembled headwalls arrive pre-wired with all levels of power, pre-piped with flexible medical gas lines, and installed in a fraction of the time compared to conventional construction schedules.

Headwalls are filled with a wide variety of utilities and sophisticated clinical equipment. Being able to easily access, repair, and update that equipment brings substantial operational maintenance savings. DIRTT wall panels remove quickly offering easy access to the in-wall components. This allows St. Elizabeth’s to easily add utilities or new technology, change acuity levels, and address ongoing maintenance issues. And they can greatly reduce the impacts as well as shut down time from days to hours.

Project Scope
ClientSt. Elizabeth's Medical Center / Steward Health Care
SolutionsInterior Construction
Square Footage10,000 square feet
PartnersHED Architecture
Consigli Construction
BR + A; CREF
BrandsDIRTT
CompletedSeptember 2020 – April 2021

Get in touch

Let’s Build Your
Vision Together

Have questions about our services or want to start your next project? Our team of experts are here to help.

Newsletter

Stay in the Know

Sign up for our monthly newsletter featuring workplace insights, project stories, company news, and more.